Hi all,
I have a Server 2012 failover cluster connected to a volume on the dell Equallogic. We setup an ASM schedule to take Smart copies and that was all working fine to begin with. However, we had a UPS shutdown event and ever since then it is just not taking any more Smart copies.
Have checked on the ASM and the schedule is still there. Checked the volume is online and the cluster is ok.
Any suggestions?